Gulf of Lion Floating Wind Turbine Project

retour Back

Gulf of Lion Floating Wind Turbine Project

Gulf of Lion Floating Wind Turbine Project

After four months of consultation, Michel Cadot, prefect of the PACA region, presented a project for the installation of floating wind turbines in the Gulf of Lion. Three areas, 15 to 20 km from the shore, were retained off Leucate, Gruissan and the Gulf of Fos. The Mediterranean is in competition with the Atlantic coast and the English Channel, three projects will ultimately be selected and known at the end of 2015.

Publication date : 7 April 2015

Reference:
G1474866_001_004
Credits:
Producteur: France 3 Montpellier   -   Journalist : Will, Thierry  -  Journalist : Saint Yves, Christine  -  Photo Journalist : Faure, Jean Philippe  -  Participant : Cadot, Michel  -  Participant : Codorniou, Didier
Origin:
Evening 3 In The Languedoc Roussillon Region   -   Producteur: France 3 Montpellier
Licence:
Turnkey

Reference:G1474866_001_004

Credits:Journalist : Will, Thierry-Journalist : Saint Yves, Christine-Photo Journalist : Faure, Jean Philippe-Participant : Cadot, Michel-Participant : Codorniou, Didier

Licence:
Turnkey
- use for cultural purposes and reserved for the actors of the network with a cultural vocation.
- in Digital Broadcasting and Events
- valid for 5 years.
editorial use
- for the purpose of informing the public or illustrating current events
- in digital distribution on its services,
- valid for 5 years.
- use for purposes of presentation and promotion of the image, brand, history, values of the Contracting Party's company
- or the case of the Beneficiary
- in digital distribution on its services and/or Events,
- valid for 1 year.
Search engine powered by ElasticSuite