Excavation from the Grand Paris Express construction site

retour Back

Excavation from the Grand Paris Express construction site

Excavation from the Grand Paris Express construction site

Report on the Grand Paris Express construction site. We are talking about the construction of four new subway lines that will be built in 2020. 200 kilometres of tunnel are to be dug and the debris will therefore be very important. Commentary on images of the excavation sites alternating with the interview of Philippe YVIN, Chairman of the Board of Directors of the Société du Grand Paris about the disposal of waste. Corinne RUFET, Vice-President of the Regional Council for Environmental Affairs, talks about waste transformation projects.

durée

01

 

min

 

26

 

sec

Publication date : 25 March 2015

Reference:
G1460771_001_021
Credits:
Producteur: France 3 Paris   -   Journalist : Dorion, Yoann  -  Photo Journalist : Askienazy, Frédéric  -  Film Editor : Riou, Eric  -  Graphic Artist : Goumiri, Nabila  -  Participant : Yvin, Philippe  -  Participant : Rufet, Corinne
Origin:
19 20 Paris Ile De France Edition   -   Producteur: France 3 Paris
Licence:
Turnkey

Reference:G1460771_001_021

Credits:Journalist : Dorion, Yoann-Photo Journalist : Askienazy, Frédéric-Film Editor : Riou, Eric-Graphic Artist : Goumiri, Nabila-Participant : Yvin, Philippe-Participant : Rufet, Corinne

Licence:
Turnkey
- use for cultural purposes and reserved for the actors of the network with a cultural vocation.
- in Digital Broadcasting and Events
- valid for 5 years.
editorial use
- for the purpose of informing the public or illustrating current events
- in digital distribution on its services,
- valid for 5 years.
- use for purposes of presentation and promotion of the image, brand, history, values of the Contracting Party's company
- or the case of the Beneficiary
- in digital distribution on its services and/or Events,
- valid for 1 year.
Search engine powered by ElasticSuite